Bride Pour Rail Rapide

´ Data sheet
Bride Pour Rail Rapide
  • ó
    GC
  • m
    Zinc Nickel
  • °
    Class 8
  • h
    35, 60, 100, 120, 150
  • s
    10
  • n
    Steel with surface coating
  • ł
    -50 / 150 ºC
  • Ł
    A1 No combustible
  • ETIM
    EC001005
Fast hold down clamp for fixing cable ladder and cable trays to 41x21 and 41x41 channel and cantilever arms in both ceiling and wall installations It facilitates the connection to the strut without additional screws thanks to the lower twist and lock part

Quick connection without screws to channel and strut in only two steps

No screws or other fasteners required. 50% savings on installation costs

Wide range. Available in heights of 35, 60, 85, 100, 120 and 150mm

In accordance with CE standard with respect to directive 2014/35 / EU

GC protection system (standard UNE-EN ISO 1461), suitable for outdoor installations and in aggressive environments. Corrosion resistance class 8 according to IEC 61537

Used for the connection of Pemsaband cable trays and Megaband® One cable ladders to 41x21 and 41x41 channel for installations of the ladder from the ceiling or to the wall in the management and distribution of cables in electrical and telecommunications installations in public buildings, infrastructures and civil works, industrial facilities, tertiary sector etc.